ERECTION OF KISSING GATES ON FP 21 DONHEAD St MARY
March 2008
All pictures © Graham Read
![]() |
![]() |
|
Start of Kissing Gate 1 |
Deciding which way to hang the gate. |
|
![]() |
![]() |
|
At the start of Kissing Gate 2 |
Kissing Gate 2 ready for concrete. |
|
![]() |
![]() |
|
Heavy soil, slow going on Kissing Gate 1. |
Brian checks levels on Kissing Gate 2. |
|
![]() |
![]() |
|
Lunch time and Kissing Gate 1 is still not finished. |
Kissing gate 2 concreted in and fence refurbished. |
|
![]() |
![]() |
|
Norman inspects the sites of Kissng Gates 3 & 4. |
Stile down & Kissing Gate 3 assembled and concreted in. |
![]() |
A good day's work by Brian, Peter
& Norman, a shame we did not have a 4th Kissing Gate |